Snowy Hydro needed to
inspect the condition of the tailrace of Tumut 1 Dam.
We were required to do the pump out in 2
days. Pumps and piping were set up at our works and all the gear tested.
We used poly pipe mounted on wheels to lower down the tunnel as the
water level fell. |