Sewer bypass at Travancore Park, Victoria

A major sewer running under the  Commonwealth Games site needed relining. The sewer was bypassed in Travancore Park. We used 2 submersible pumps and 2 self priming pumps as back up. The submersible pumps were controlled automatically via level sensing electronics, and all powered by silenced generators.  Our brief was for maximum reliability, no spillage, and no down time.

The setup was to be manned 24 hours a day for 2 months so it was necessary to have a site office and all staff amenities. We mounted switchboards and control instrumentation in the site office. Electronic level detection and closed circuit TV was used to monitor suction and discharge manholes.

 

A riser cover was fabricated to accommodate a lifting frame and access for the various pipes going into and out of the sewer riser.

The riser cover cover was sealed to the ground to prevent any escape of unpleasant odours.